null
my-cart-icon svg-my-account svg-arrow-next svg-arrow-prev

Shires Extra Long Lead Rope

£7.19 £7.19

Shires Extra Long Lead Rope 

A highly useful extra long lead rope with a high quality brass swivel trigger clip and a length of 3 meters. Available in a range of colours. 

Extra Long Lead Rope Features: 

  • 3 meters length 
  • 100% Polyester 
  • Brass swivel trigger clip 

Related Products